Strata Painting on High Rise Buildings

How Perth strata companies and building managers can plan a high rise repaint, from the first condition check to the final coat, using rope access.

Rope access technician working on the wall of a Perth high rise
STRATA PAINTING GUIDE

What Strata Painting Involves on a High Rise

Strata painting on a high rise is more than a colour choice. For a Perth strata company or building manager, a repaint means planning the budget, checking the facade for repairs, writing a clear scope, choosing how the painters will reach the walls and keeping residents informed along the way.

This guide walks through each step in the order we suggest tackling them, so your next strata repaint runs to plan. Signs it is time to start planning:

PLANNING THE REPAINT

How to Plan a Strata Repaint Without Scaffolding

A high rise repaint is one of the larger items a strata company will fund, and most of the cost and disruption is decided long before a painter opens a tin. Getting the planning right is what keeps the job on budget, keeps residents onside and gives the new coating its best chance of lasting.

1. Start with the 10-year plan and the reserve fund

In Western Australia, strata schemes with 10 or more lots, or with a replacement value of $5 million or more, must have a 10-year plan and a reserve fund. The plan lists the common property expected to need work over the next decade with estimated costs, owners approve it at the annual general meeting, and it must be revised at least every five years. Landgate’s resources for strata companies explain how this works. If the external repaint is already in the plan, the money should be there when the building needs it. If it is not, raise it at the next AGM so levies can be set with the repaint in mind.

The strata company must also keep common property in good and serviceable repair, so a tired, peeling facade is not just a cosmetic issue. Looking after it is part of looking after the building for every owner. A repaint is one part of high rise building maintenance, so it is worth asking whether any other work at height can be done on the same visit.

2. Get a condition check before you get a price

Paint failure is often a symptom of something else. Before anyone quotes on colours and coats, have the facade looked at up close for:

  • Cracks in render and concrete, and around window frames
  • Rust staining or drummy concrete that can point to concrete cancer
  • Failed or shrunken sealant and caulking at joints and windows
  • Water staining that suggests leaks behind the paint
  • Chalking, flaking and blistering of the existing coating

Any of these need fixing first. Painting over cracked concrete or failed sealant only hides the problem for a while, and the new paint fails along with it. Up2 carries out these facade repairs by rope access as part of the same job, so the repairs and the repaint are handled by one crew.

3. Write a clear scope of works

A clear scope lets the committee compare quotes like for like. It should cover:

  • Which elevations, balconies, soffits and features are included
  • Surface preparation: washing, scraping, crack and concrete repairs and sealant replacement
  • The paint system, including primers and the number of coats, as specified by the paint manufacturer for each surface
  • Colours, and whether a colour change needs owner approval
  • The access method, resident notices, and how balconies and windows will be protected

Ask every painter to quote to the same scope. If the paint maker can provide a written specification for the building, use it as the basis for every quote.

4. Choose the access method early

On a high rise, access can be a large part of the cost and most of the disruption. Scaffolding wraps the building for weeks, blocks light and balconies and raises security concerns. Swing stages and boom lifts suit some sites but not others. Rope access painters abseil each drop from the roof anchors, so there is no scaffold to hire, erect or remove, and residents keep their balconies between drops. Our guide to rope access vs scaffolding compares the options in more detail. You can also see how our high rise painting Perth service works.

Rope access relies on certified roof anchors, so check that the anchor certification is current before the job is booked. Up2 also carries out anchor testing if it is due.

5. Time the job around Perth weather

Paint needs dry surfaces and suitable temperatures to cure properly. Plan around Perth’s wetter winter months and the hottest summer days, and leave room in the schedule for weather delays. Coastal buildings in suburbs like Fremantle and Scarborough take more salt and wind, so their facades often need attention more often. A facade wash before painting removes salt, dirt and mould so the new coating can bond to a clean surface.

6. Keep residents informed

A repaint goes far more smoothly when residents know what is happening. Give notice of the dates each elevation will be worked on, ask residents to clear their balconies and keep windows closed while the crew is on their drop, and give them a contact for questions. Rope access helps here, because the crew is only outside each section of the building for a short time.

7. Protect the finish once it is done

Once the repaint is finished, add regular washing and a periodic inspection to the maintenance plan. Paint manufacturers publish maintenance guidance for their systems, so check the product data and any warranty conditions for the system used on your building and plan the washes to suit.

Up2 Rope Access paints and maintains apartment and strata buildings across Perth, including South Perth, East Perth and Fremantle. See all the areas we service, or contact us to talk through your building. For the glass, see our high rise window cleaning Perth service.

MEc04a0747384eb3160be6efb71a3dd064
ChatGPT-Image-Aug-5-2026-08_17_26-AM
ROPE ACCESS YOU CAN RELY ON
From painting to facade repairs and building wash-downs, Up2 Rope Access handles the lot across Perth and WA. Fully insured, proactive and done properly.
25+

Years of Experience

100%

Quality Workmanship

1

Crew, Whole Job

5★

Google Rated

ChatGPT-Image-Aug-5-2026-08_17_26-AM
STRATA PAINTING FAQS

Strata Painting Questions From Building Managers

Strata painting is painting the common property of a strata scheme, such as the external walls, balconies, soffits and shared areas of an apartment building. The work is organised and paid for by the strata company, rather than by individual owners.

The strata company is responsible for maintaining common property, so an external repaint is normally funded through levies. Schemes with 10 or more lots, or a replacement value of $5 million or more, must have a reserve fund and a 10-year plan, which should allow for it. Your strata manager can confirm how your scheme is set up.

It depends on the paint system used, how much sun, salt and wind the building faces, and how well it has been maintained. Rather than relying on a set number of years, have the facade inspected and follow the paint manufacturer’s guidance for the system on your building.

Yes. Rope access painters abseil down the building from certified roof anchors, so there is no scaffold to put up or take down. Residents keep the use of their balconies between drops, and the street and entry stay clear.

Yes. Cracks, concrete cancer, failed sealant and leaks should be fixed before any paint goes on, or the new coating will fail along with them. Up2 can carry out these facade repairs by rope access in the same job as the repaint.

Contact Up2 Rope Access with the building address, the areas you want painted and any scope or specification you already have. We will come back to you with a quote your committee can compare against others.

Trusted By Perth Businesses